Asked to pay before SEPT/08 to secure a SEPT/12 ship out for a set of BE Bearings + ARP Rod Bolts.
Paid on SEPT/07 and have not heard from Abdul to confirm any shipping nor able to get through to him via PM.
Anyone else going through the same situation?
|