Quote:
Originally Posted by S65NAPWR
From a completed production, what I've noticed is
2 weeks waiting at the dock (Port of Exit)
2 weeks or less travel time to Port of Arrival
1 week or less (Vehicle Prep and sent to your dealer)
That puts you in early January. It all depends though, has your been waiting at the docks already?
Good luck!
|
Nope I check my vin # at the load ship page and it is not there. Hopefully it will reach the dock soon. The build date on my vin was 11/20/12 and it could be waiting to be move to the docks. I will just have to wait and check it out in mid December.