Quote:
Originally Posted by Captain Starbucks
Thanks for the FYI TMANN.
What all did you have done? I was going to have him do rod bearings and engine mounts. Then I got to thinking, might as well have him do Ohlins R&T as well.
What was his turnaround time?
|
That's what I had done as well, plus I replaced the oil pan with a VAC baffled pan. Two days, as quoted, though I picked up on the 3rd day.