Quote:
Originally Posted by Rom3n
Stage 2 requires the customer to exchange the manifold as it has a manifold mounted heat exchanger. The rest is pretty straight forward.
I can if you need it.
Stage 1 is rated at 6 hrs of installation. It can be done quicker if the mechanic is good or has experience installing the kit.
|
wanna check the oil level in the charger so i figured the manual will tell you which port has the dipstick in it