|
The contractors finished most of the secondary patio side today. All of the pavers and turf are in. Still lots to do on that side of the house though. There is still more vines, another Greenspire (..to total six by that side patio) and two Texas Privets to plant (..to block the view of the A/C units), and I am having a decorative gate made to obscure the pool equipment.
Last edited by Sedan_Clan; 02-26-2026 at 05:34 PM..
|