Quote:
Originally Posted by e92zero
It took me like 3.5 days from the first moment I step into the garage until the moment I cleaned up and put everything away. I ran into some problems removing the stud from the factory oil cooler and had to run out to a hardware store to pick up some M8x1.25x16mm socket head screws for the VFE oil cooler. I also stop the first day after I drop the oil pan to let the oil drip out as I didn't want to have to fight with oil dripping on my face. I 'really' took my time to figure out how to remove/reroute things and cleaned up all the bolts that had thread locks on them. If I have to do this again, I should be able to get it done in less than 3 days. It should be doable in 2 though I think. If you have a lift, it will be much faster. A lot of the time was spend lowering/raising the subframe/suspension arms and trying to line everything up. I was doing this all by myself with no other helping hand. 
|
After reading and seen what you have done ...I've realy

for you !
