I thought I would start a new thread considering this sub has been a little bit dead with track season on standby.
Track season is quickly approaching and winter upgrades are coming to a close. What has everyone been working on over the winter?
I have done:
Fixed an oil filter housing leak
Flushed power steering
Flushed coolant
MRT Engineering front tension arms
Bimmerworld front end links
Hotchkis front sway bar
GT4 V1 front splitter
To do:
Get 2 v bands welded to the exhaust
Install rear adjustable end links
Install APR GT250 Wing
Install GT4 Canards
Get tires and have them mounted
(Maybe) install seat I picked up Saturday
Install Bimmerworld toe arms
Install SLG eccentric lockout
Alignment
I am worried I won't get done in time! First (planned) track day is at the end of March.
Track season is quickly approaching and winter upgrades are coming to a close. What has everyone been working on over the winter?
I have done:
Fixed an oil filter housing leak
Flushed power steering
Flushed coolant
MRT Engineering front tension arms
Bimmerworld front end links
Hotchkis front sway bar
GT4 V1 front splitter
To do:
Get 2 v bands welded to the exhaust
Install rear adjustable end links
Install APR GT250 Wing
Install GT4 Canards
Get tires and have them mounted
(Maybe) install seat I picked up Saturday
Install Bimmerworld toe arms
Install SLG eccentric lockout
Alignment
I am worried I won't get done in time! First (planned) track day is at the end of March.