|
We are still working to get the car ready for this event. It was basically a bare chassis with 1 1/2 weeks to go. All electrical needs to be sorted, new fuel lines, lexan windows, install engine, trans, diff, drive line, etc........ Everything is easy but the electrical and fuel lines. It will be very close and take some luck that something unexpected doesn't show up. Stop by and say hi......if we make it.
|