View Single Post
      08-03-2012, 10:18 AM   #9
Bully
New Member
United_States
3
Rep
21
Posts

Drives: 2009 Black M3 Vert
Join Date: Jan 2011
Location: Hendersonville, NC

iTrader: (0)

Thanks for the comment "The Tech"

I forgot to add a #15 Torx is needed for the Vert switch .
The hand brake boot install was 20 minutes because my weak hand had trouble holding the boot and zip tie in a good position.
About two hours of drilling/cutting/sanding and switch opening, which I did in 20 minute interval, in order to minimize mistakes.